Why we do take concrete compressive strength at 28 dayes?? Even it is 90% of its total strength???Er. Abhishek SinghMay 2, 20180 min read
What is the difference between a column & shear wall and a concrete wall & shear wall structThe main difference i column and shear wall lies in its response to the load applied to it and its functionality. Column: The primary...